Thursday 25 December 2014

PROGRESS ON THE BRIDGE JUST BEFORE CHRISTMAS

These pictures were taken on 18th December 2014

The pre-stressed beams are still not installed because their lifting cranes must still be used elsewhere on another bridge construction

So they dug up the temporary fill and reinstated the slope of the river bank protecting it with gabions and concrete surface, so that flow of water during floods will not be hampered under the bridge.

See for yourself if you like them.



 Note the one row of gabions at the bottom of the concreted slope.

 Full view of the concreted slope


 Excavator stabilising the bottom of slope near bottom of river


 Excavating the RH bank to do the same type of concreting


Meanwhile down below, a crane is hoping to catch fish from the river.