Tuesday 2 March 2021

FORMWORK FOR THE PRESTRESSED CONCRETE BEAM OF DAMBAI BRIDGE

 


 Recorded on 8 Sept 2015 at 9.10am.

I regreted not asking or measuring the dimensions of this beam which was constructed on one lane of the new road, but I estimated the length to be 20 metres.  It had two steel tendons, one at bottom and another nearer the middle of the beam depth. 

Anyhow any bridge structure design engineers can tell this is simply a standard design shape and sizes.

My purpose was to record on my camera the history of this bridge construction for future reference by any students or lecturers at any universities or institution to get a feel of the dimensions with the car as a scale to compare.