Thursday 31 July 2014

SITE QUITE AND LOOKED ABANDONED FOR THE HARI RAYA HOLIDAYS as seen on 30 July 2014

Yes OF COURSE it is still holidays for the workers as on 30th July.

perhaps the workers deserve the long break as it is not that fun working under the sun, if you have ever tried just being a project supervisor.

Just being on site for one day will make all of your aircon office workers squirm. ha ha

 Not a soul seen on site since all workers on holidays even though 30 July is a working day.

 Five concrete beams all completed and the last two still waiting for the curing period.  Notice those cables jutting out from the top and bottom of the beams.  They are not yet tensioned and the end plates are still pending installation.

 At the left bank pile cap, these positions must be for the bearing points for the prestressed beams.

 Right bank pile cap have just been concreted.

 Extension base for the Slope retention wall

 Construction access for the bank protections or gabions

 Nearby, the cover for this waterpipe manhole was again broken and gone. Last time I saw, it was made of concrete but when vehicles ran over it, as always it get damaged and broken and some idiot even have his car wheel going into the gap.  Ha !


And the nearby bambangan fruit is still growing.  I think I gonna ask the owner for a few.